A custom home build or major renovation in Greater Victoria almost always needs more than one permit — typically a building permit, often a development permit, and separate trade permits for plumbing, electrical, and gas. Here’s what each one covers, roughly what they cost, and how long to expect the process to take.
What permits does a custom home or major renovation need?
Most custom builds and major renovations involve some combination of:
- Building permit — the core approval that confirms your project satisfies the BC Building Code and local bylaw regulations. Nearly every build and major reno needs one.
- Development permit — required when your lot falls within a Development Permit Area (more on this below).
- Demolition permit — if you’re removing an existing structure before building.
- Plumbing, electrical, and gas permits — separate trade permits, usually pulled by the respective licensed trades.
- Occasionally: subdivision, tree-removal, or blasting permits, depending on the site.
What’s the difference between a building permit and a development permit?
A building permit approves how you build — structure, safety, and code compliance. A development permit approves what and where you build in areas with extra design or environmental rules, such as form-and-character guidelines, steep slopes, or shoreline and environmental protection.
Not every property needs a development permit; it depends on whether your lot sits inside a Development Permit Area, which each municipality maps in its Official Community Plan. When a development permit is required, it usually has to be approved before the building permit — which affects your timeline.
How much do permits cost?
Permit fees are typically calculated from the value of your construction — commonly a set rate per $1,000 of project value — so the larger the build, the larger the fee. On top of the base permit fee, there can be deposits, development cost charges, and servicing fees. Because every municipality sets its own fee schedule, check your local municipality’s website for the exact rates that apply to your property.
How long does permitting take?
Honestly, it varies more than most homeowners expect — anywhere from about four to six weeks in the most straightforward cases to ten months or more for complex ones. The timeline depends on the municipality, the specifics of your property, and whether any additional approvals apply on top of the standard building permit.
A few things can extend the process. Some properties fall under extra layers of review — for example, special design-approval areas such as the Uplands, or Agricultural Land Commission review when a property is within the Agricultural Land Reserve. These sit on top of the regular permit and can add significant time. More generally, anything that sends an application back for revision — an incomplete submission, a development permit that has to be approved before the building permit, or design changes made mid-review — adds weeks or months.
The biggest lever you actually control is the quality of the submission. A complete, correct application prepared with experienced engineers and consultants moves through far more smoothly than one that has to go back and forth. It’s one of the main reasons working with an experienced builder from the start pays off.
What documents do you need to apply?
A typical custom-home application includes the certificate of title, a site/plot plan, full architectural drawings, structural engineering, energy-compliance documentation under the BC Energy Step Code, and — depending on the lot — arborist or geotechnical reports.
Does GT Mann handle the permits, or do I?
Yes — GT Mann submits permits on behalf of our clients. In fact, we offer preconstruction services that can take you all the way from “what can I build on my lot?” through to an approved building permit. That includes recommending home designers and interior designers and coordinating with the consultants your project needs. For most homeowners, navigating municipal requirements is the least familiar part of building; having an experienced builder manage permitting from start to finish removes the guesswork and keeps the application complete the first time — which is also the fastest way through.